GUANGZHOU TECHWAY MACHINERY CORPORATION

Build the World with Starry Quality

Manufacturer from China
Verified Supplier
4 Years
Home / Products / Concrete Placing Boom /

Horizontal Concrete Boom Pump , 11kw Hydraulic Placing Boom

Contact Now
GUANGZHOU TECHWAY MACHINERY CORPORATION
Visit Website
City:guangzhou
Country/Region:china
Contact Person:MrZhang Chen
Contact Now

Horizontal Concrete Boom Pump , 11kw Hydraulic Placing Boom

Ask Latest Price
Brand Name :TECHWAY
Model Number :FHGY-24
Certification :CE
Place of Origin :China
MOQ :1Unit
Price :Negotiable
Payment Terms :L/C, T/T
Supply Ability :100 Units per month
Delivery Time :30 Days after advance payment
Packaging Details :Nude in Container, 1x40'HQ
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Floor Mounted Concrete Placing Boom / FHGY24 Floor fixed placing boom/ Stationary Concrete Placing Boom

Features:

1. Boom

The placing boom takes advantage of mature manufacturing platform of boom design of truck-mounted concrete boom. On the base of accuracy data, the boom structure is optimized through finite element analysis, modal analysis, dynamics simulation analysis and endurance test on model machine. The accuracy of design and data is assured through powerful test and industrial assess means. The same-class weld manufacturing technique is adopted for the boom, the quality is excellent.

2. Rotary table and slewing mechanism

The slewing support is a large-sized bearing which connects the boom and the column, and bears the overturning moment produced by the boom. It is a key component that directly affects the whole machine’s safety. The motor redactor is from Brevini in Italy and Dianamic in USA. It is in a high speed rate, and long life span and reliable. The hydraulic motor can rotate the slewing table and the boom 365°through the redactor.

3.Tubular column

The fortified tubular column is adopted. Deformation of the head of the tubular column is 20%~25% less than congener products, it improves the precision for pouring concrete and reduces vibration of the tube.

The connecting structure parts are optimized, and the rigidity of the column is well and the vibration becomes less

4. Climbing device

Two climbing modes are for choice: climbing device on floor and climbing device in elevator well. The climbing structure has been optimized and inclined block auxiliary structure is adopted in the tubular column. All can eliminate the error effectively for drilling holes in the floor.

Specifications:

Horizontal Concrete Boom Pump , 11kw Hydraulic Placing Boom

Case Show:

Horizontal Concrete Boom Pump , 11kw Hydraulic Placing Boom

Horizontal Concrete Boom Pump , 11kw Hydraulic Placing BoomHorizontal Concrete Boom Pump , 11kw Hydraulic Placing Boom

Inquiry Cart 0